Marriott Hotel, GRA, Ikeja is the flagship hotel destination of the Marriott Hotels in Nigeria. The hotel design comprises six (6) floors and three (3) basement levels for parking. A bazaar, international standard swimming pool and hall are also amongst the special unique features of the hotel. These features are the basis for our involvement in the project.
Our scope of work for this project involves the fabrication and installation of 6 structural steel girders (21m span each), as well as other high-grade structural steel members (UBs, UCs, CHSs, SHSs, RHSs and Purlins) on several floors of the building.
The concept of the steel girders is such that they provide better, faster and lighter means of supporting a suspended floor spanning a very large area during the construction phase when compared to the use reinforced concrete over the same area.
The project duration spans two-and-half years and will be commissioned in 2018.
Client
Marriott Hotel
What We Did
Structural Steel Fabrication and Installation